Skip to main content
OpsWork
Menu

Built for UK HV substation design (11 kV – 400 kV)

The operations system for high-voltage consultancies.

Six specialist agents — Emma, Sarah, James, Robert, Michael, Paul — handle the recurring work of a UK substation design practice. They run inside the trust boundary of your own Microsoft 365 tenant. No data leaves your walls.

Six agents. One operating system.

Each agent owns a discipline. You keep oversight via a three-button approval flow — Approve, Tell <agent>, Postpone — surfaced in Outlook and Teams.

Emma

Business Development

Enquiry intake, quotation drafting, follow-ups.

Sarah

Doc Control + Quality

ISO 9001, document register, version control.

James

Project Management (NEC4)

Early warnings, programme, compensation events.

Robert

Engineering Coordination

HV calculations, design clash detection.

Michael

Finance + Commercial

Receipts, R&D capture, statutory cycle.

Paul

HR + Admin

NERS passport sync, training, IR35.

Why operators choose OpsWork

Designed in the lift cabin, not the corner office.

OpsWork was built by a chartered electrical engineer for working consultancies. Every workflow comes from a real substation job — RFIs, RAMS, ITPs, NERS submissions, NEC4 early warnings. The agents speak engineering, not chatbot.

  • Your tenant, your data.

    SharePoint, Outlook, Teams — agents work where your team already does.

  • UK engineering standards built in.

    BS 7671, IEC 60909, ENA G99, CDM 2015, NERS — referenced clause-by-clause.

  • Months of proving before you deploy.

    Every feature passes 1,000+ synthetic test runs before it touches real client work.

Stop losing weekends to paperwork.

Book a 30-minute walkthrough. We'll show how OpsWork handles your typical Monday inbox in under two minutes.